Norwood Engineers have successfully installed two new 250 Amp, 3 phase supplies to the theatres at St Cross hospital in Rugby. The first supply was installed to the main busbar, with the second routed to the IPS/UPS room. The cables were installed in 150mm ducting from the main feeder pillar to the theatres. At Norwood we pride ourselves on the quality of our work, and aim to exceed expectations.