
In the autumn 2019 the University of Warwick (UOW) procured their looked to tender and award a contract utilising the NWUPC Framework EFM3131NW, for the 5-year electrical testing across all University properties.
EICR – FIXED WIRE TESTING
Norwood were successful with their bid to supply EICR’s over the contract period, which includes testing over 30,000 circuits across the Coventry and Wellesbourne Campus’s. Norwood have utilized a dedicated-on site Contracts Manager along with up to eight directly employed engineers to undertake the works
during both the academic and holiday periods. Working to a very robust delivery specification including the testing of all circuits and RCDs, full asset and accessory labelling with distribution board and circuit designation references, Distribution Board Schedules and upon completion production of AutoCAD schematic drawings. Norwood then deliver all associated documentation in digital and folder bound hard copies to the estates team.
OUTCOME
Norwood’s team work daily to ensure SLAs and KPIs are maintained to the highest standards and reported monthly to the UOW Head of Estates and Electrical Division. Utilising the same engineers and contract manager, Norwood ensures consistency, continuity, and site familiarisation always
OFFICE LINE
0844 800 5540
STANDARD RATE
01509 672 333
WORKING HOURS
9:00am – 5:00pm
OFFICE LINE
0844 800 5540
STANDARD RATE
01509 672 333
WORKING HOURS
9:00am – 5:00pm
OTHER PROJECTS
FREE QUOTE
Please contact us to obtain a free no obligation quotation for any of our services.